DCData Centers Must GoView all public information materials

Panic Desk export

Four numbers, fully alarmed.

Four 1200 × 675 public panic bulletins. The evidence scopes and source records stay attached. The denominators have been detained elsewhere.

Panic Desk share card reading 66 billion liters, that’s too many liters, paired with an attached receipt showing less than six hours of U.S. irrigation and the Berkeley Lab source.
01/04

The national water emergency

Evidence scope
66B L · U.S. fleet · 2023 · direct on-site consumption
Source record
Berkeley Lab, 2024 U.S. Data Center Energy Usage Report, pp. 54–58.

Suggested post

66 BILLION LITERS. Data centers consumed that much water on-site in 2023. They are using all the water. https://datacentersmustgo.com/#translator
Panic Desk share card promoting a 21 percent local water share while also showing the below 0.5 percent Virginia statewide share and JLARC source.
02/04

The local maximum goes national

Evidence scope
Highest of six reviewed Virginia local shares · 2023 · non-reclaimed water
Source record
Virginia JLARC, Data Centers in Virginia, pp. 78–82.

Suggested post

At one reviewed Virginia utility, data centers used 21% of non-reclaimed water in 2023. Statewide, they were below 0.5% of all withdrawals. We selected the local maximum for national distribution. https://datacentersmustgo.com/#translator
Panic Desk share card reading public education has been compromised by money beside the reported 50,935 dollar one-time Richland Parish payout.
03/04

Public education revenue incident

Evidence scope
Richland Parish, Louisiana · 2026 · reported one-time gross payout
Source record
GovTech and The Advocate, Richland Parish school payout reporting.

Suggested post

Qualifying Richland Parish certified school employees received $50,935 one-time payouts during Meta’s construction-era sales-tax boom. Public education has been compromised by money. https://datacentersmustgo.com/#translator
Panic Desk share card subtracting 50 ongoing operations jobs from a 1,500-worker construction peak and calling the difference deleted jobs.
04/04

1,450 jobs apparently deleted

Evidence scope
Typical Virginia building · peak construction / ongoing operations
Source record
Virginia JLARC, Data Centers in Virginia, pp. 13–16.

Suggested post

A typical Virginia data-center build can peak near 1,500 construction workers, then operate with about 50 people. The other 1,450 were apparently deleted when somebody tightened the last bolt. https://datacentersmustgo.com/#translator